← Return to Custom Engineering Hub
TAIBANG MACHINERY

Floor Space, Logistics & Utility Intake Worksheet

PLANNING WORKSHEET Document Ref: TB-ENG-LAY-03
Direct Download · Self-Contained
Scope & Engineering Notice

Input collection worksheet only — not a safety or civil design: This worksheet is an intake questionnaire designed to gather facility envelope dimensions, coil handling routes, and utility connections. It does NOT constitute a certified civil foundation, structural engineering, crane runway assessment, or life-safety egress design. Soil bearing capacity, slab anchoring, foundation thickness, dynamic equipment vibrations, and statutory fire egress must be surveyed, designed, and approved by licensed local engineering professionals.

Data Retention Notice: Data entered into this worksheet is maintained only within your active browser session and is not saved or transmitted remotely. Please use Print / Save to PDF to retain your completed survey records.

Roll Forming Line Factory Layout Planning Worksheet

Planning a roll forming production cell requires evaluating the linear flow from raw coil storage to finished sheet bundling. Complete the dimension and utility fields below to enable engineering review of line clearances, uncoiling geometry, and power connections.

Linear Production Flow Sequence
01. Coil Staging
→
02. Decoiler & Infeed
→
03. Roll Forming Bed
→
04. Cut-Off Station
→
05. Outfeed & Stacking
01 Workshop Bay Envelopes & Access
Facility Parameter Description / Minimum Considerations Measured Site Dimension
Bay Total Length Total unobstructed linear distance in the proposed production bay.
Bay Clear Width Available width between building structural columns.
Eaves Clear Height Clear vertical height from floor to bottom of crane beam or roof truss.
Overhead Crane Capacity Rated hoist capacity of bridge crane for coil loading (or state "Forklift only").
Hook Elevation Height Maximum hook clearance height above finished concrete slab.
Concrete Slab Condition Existing reinforced concrete floor thickness and flatness condition.
02 Equipment Clearances & Material Logistics
Station Section Planning Clearance Guidance Allocated Floor Space
Raw Coil Staging Zone Space required to store incoming coils adjacent to decoiler mandrel.
Decoiler to Entry Buffer Space between decoiler centerline and roll forming entry guide table.
Drive Side Clearance Maintenance aisle behind motors, gearboxes, or chain drives.
Operator Side Clearance Working aisle for operator console, jog buttons, and sheet inspection.
Maximum Sheet Length Maximum product cut length expected (determines runout table length).
Finished Goods Staging Area for packaging, strapping, bundle staging, and warehouse forklift aisle.
03 Electrical & Utility Supply Connections
Utility Service Field Interface Requirements Factory Provision Recorded
Main Supply Voltage Line-to-line 3-phase industrial voltage (e.g. 220V, 380V, 415V, 440V, 480V).
Power Grid Frequency Grid frequency: 50 Hz vs 60 Hz. VFD parameters and motor windings match this.
Transformer Capacity Spare electrical capacity available at plant distribution panel (kVA or Amps).
Compressed Air Supply Plant pneumatic line pressure (if pneumatic punching or stacking is ordered).
Hydraulic Pit Required? Indicate if plant slab allows recessed coil car track or pit if selected.